CONTRACTOR
Aguirre Roden
SQUARE FOOTAGE
12,000
LOCATION
Carrollton, TX
PROJECT USE
Industrial
​
HALIBURTON
DESIGN CONSULTATION + STEEL BUILDING ERECTION
Highline was able to work with the project design team to come up with a cost effective solution for the masonry requirements and provide a schedule that would meet the owner’s needs.
Once construction began erection crews were able to accelerate the schedule and make up for time lost by other trades while maintaining the highest safety standards due to site conditions.